Sr. No. | Tender Issuing Office | Tender Notice No. | Scope of Work | Estimated Cost(Rs.) | Earnest Money Deposit (Rs.) | Closing Date & Time for Submission of Tender | Date & Time of Opening of Tender | S.no | LINK | open time | Subm time | View Tender Document | Remark/RFx ID for e-Bidding |
1
| SE (Elec & Test-I) O&M-I | 021-07/HTPS/EMD-I/UTW/5633/1737 | Supply and Installation of starter panel for 35 HP 3 Ph. motor at 415V, for EMD-I, PH-I HTPS KW | 186440.00 | 1864.00 | 22/10/2024 03:00PM | 22/10/2024 04:00PM | 25294 |
| 04:00PM | 03:00PM |
| |
2
| SE (Elec & Test-I) O&M-I | 021-07/HTPS/EMD-I/UTW/5461/1736 | Supply and Installation of Junction box at HTPS Colony for EMD-I,PH-I,HTPS KW. | 199862.50 | 1999.00 | 24/10/2024 03:00PM | 24/10/2024 04:00PM | 25293 |
| 04:00PM | 03:00PM |
| |
3
| SE (Elec & Test-I) O&M-I | 021-07/HTPS/EMD-I/UTW/5692/1735 | Proposal for lighting circuit Re-wiring at Prakash with supply of lighting materials for EMD-I, PH-I,HTPS | 183755.50 | 1838.00 | 23/10/2024 03:00PM | 23/10/2024 04:00PM | 25292 |
| 04:00PM | 03:00PM |
| |
4
| ACE (S&P) | No. 021-10/HTPS/Oprn-I/UTP-1756/2024 | Procurement of Fine chemicals and lab wares/spares for Chemical Laboratory, 4X210MW HTPS, CSPGCL, Korba West. | 244822.84 | 2450/- | 17/10/2024 04:00PM | 17/10/2024 04:30PM | 25288 |
| 04:30PM | 04:00PM |
| RFx No. 8100038731 |
5
| SE (Boiler-II) O&M-I, KW | 021-11/B-II/AH&F/PUT-1476/ 799 dt. 24.09.2024 | Supply of Oblong Welded Link Chain for ESP Hoppers Fly Ash dislodging System. | 193156.56 | 0.00 | 15/10/2024 03:00PM | 15/10/2024 03:30PM | 25273 |
| 03:30PM | 03:00PM |
| |
6
| SE (Boiler-II) O&M-I, KW | 021-11/HTPS/B-II/AH&F/WUT-1477/ 800 dt. 24.09.2024 | Painting of Structure of PA fan area of U#03, ABL Boiler, HTPS, Korba West. | 195880.00 | 1960.00 | 15/10/2024 03:00PM | 15/10/2024 03:30PM | 25274 |
| 03:30PM | 03:00PM |
| |
7
| ACE (S&P) | 294/2024 | Procurement of Complete Assembled Electrical Distribution Board for EMD-I, 1x500 MW, Korba West. | 781230.80 | 7815/- | 15/10/2024 04:00PM | 15/10/2024 04:30PM | 25281 |
| 04:30PM | 04:00PM |
| ET-III/ T- 397/ 2024 RFX No. 8100038931 |
8
| ACE (S&P) | No. 021-10/HTPS/Misc/UTP-138/2024 | Procurement of consumable item (Cotton Waste, Soap and Drinking Glass) for HTPS, CSPGCL, Korba West. | 246897.50 | 2470.00 | 10/10/2024 04:00PM | 10/10/2024 04:30PM | 25080 |
| 04:30PM | 04:00PM |
| 8100038998 |
9
| ACE (S&P) | No. 021-10/MISC/OPRN-II/UTP-136/2024 | Procurement of two-way Connecter Porcelain Runner Pair, Heater coils and Heater plates for Plant Canteen of 4x210MW ,HTPS Korba West | 409871.82 | 4100.00 | 11/10/2024 04:00PM | 11/10/2024 04:30PM | 25019 |
| 04:30PM | 04:00PM |
| 8100038774 |
10
| ACE (S&P) | 296/2024 | Work of Repair & Reconditioning of Journal Head Assembly of XRP 1003 Coal Mill, 1x500 MW, HTPS, Korba West. | 633292.05 | 6335/- | 08/10/2024 04:00PM | 08/10/2024 04:30PM | 25104 |
| 04:30PM | 04:00PM |
| BM-III/ T-401/ 2024 RFX No. 8100038940 |
11
| ACE (S&P) | 294/2024 | Procurement of Complete Assembled Electrical Distribution Board for EMD-I, 1x500 MW, Korba West. | 781230.80 | 7815/- | 09/10/2024 04:00PM | 09/10/2024 04:30PM | 25091 |
| 04:30PM | 04:00PM |
| ET-III/ T- 397/ 2024 RFX No. 8100038391 |
12
| ACE (S&P) | No. 021-1710/TM-III/UTW-2080/2024/3834, KW Dtd 30.08.2024 | Tender for Deployment of Operator for EOT crane-1 No. 105/15 Tons capacity and electric wire rope hoist for day to day operation & for odd hours operation of T.G & Auxiliaries of 1x500MW, HTPS, Korba West | 366115.65 | 3665.00 | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25102 |
| 04:30PM | 04:00PM |
| RFx No. 8100039016 |
13
| ACE (S&P) | 295/2024 | Supply and Installation of abrasive & impact resistant liners along with fasteners as detailed in schedule of CHP: INT (1x500 MW & 4x210 MW), HTPS, Korba West. | 1377503.20 | 13780/- | 07/10/2024 04:00PM | 07/10/2024 04:30PM | 25094 |
| 04:30PM | 04:00PM |
| CHP MM/ T- 399/ 2024 RFX No. 8100038937 |
14
| SE (Elect & Test) | SE/ET-III/1x500MW/TW-167/EMD-M/2024/746 dt.24.09.2024 | Regarding Tender Inviting Notice for Fabrication and Erection of CW Motor Stand at 1x500MW, KWB. | 37147.87 | 0 | 17/10/2024 03:00PM | 17/10/2024 04:15PM | 25276 |
| 04:15PM | 03:00PM |
| |
15
| SE (Boiler-I) O&M-I, KW | 021-08/UTW2623L0007/657 Dtd. 23.09.2024 | Procurement of Scrapper Assembly for XRP-803 Mill of 210 MW BHEL Boiler of U # 1&2, PH-I, HTPS, KWB. | 177823.40 | | 14/10/2024 03:00PM | 15/10/2024 04:30PM | 25271 |
| 04:30PM | 03:00PM |
| |
16
| SE (Boiler-I) O&M-I, KW | 021-08/UTW2624L0006/646 Dtd. 20.09.2024 | Procurement of MSSV Bush for 210 MW BHEL Boiler U # 1&2 PH-I, HTPS KWB. | 185250.56 | | 14/10/2024 03:00PM | 15/10/2024 03:30PM | 25270 |
| 03:30PM | 03:00PM |
| |
17
| SE (CHP Int Opn) | 021-1446/CHPIO/WSG/UTP-03/24/3035, Korba West, dated 23.09.2024 | Supply of Air Cooler, Size 36" x 30" x 60" | 84912.80 | 0.00 | 14/10/2024 04:00PM | 15/10/2024 04:30PM | 25269 |
| 04:30PM | 04:00PM |
| Offline Tender |
18
| SE (Elect & Test) | SE/ET-III/1X500MW/TW-166/T-III/2024/736 dtd.23.09.2024 | Communication of different Relays at MCR, ECR and HT SWGR to Testing in Lab at 1x500MW, KWB. | 199302.00 | 1993.00 | 16/10/2024 03:00PM | 16/10/2024 04:15PM | 25265 |
| 04:15PM | 03:00PM |
| |
19
| ACE (S&P) | No.021-10/CHEM/UTW- 5688/2024/4109 | Tender for Stamping of Belt Weigher of conveyor 1C, 1D and 1E at CHP: EXT, HTPS, Korba West. | 301254.00 | 3015.00 | 14/10/2024 04:00PM | 14/10/2024 04:30PM | 25250 |
| 04:30PM | 04:00PM |
| 8100039366 |
20
| ACE (S&P) | 294/2024 | Procurement of cage with diffuser of silo for Ash Handling plant 1x500 MW, HTPS, KWB. | 645696/- | 6460/- | 07/10/2024 04:00PM | 07/10/2024 04:30PM | 25090 |
| 04:30PM | 04:00PM |
| AH-II/ T- 396/ 2024 RFX No. 8100038926 |
21
| ACE (S&P) | 294/204 | Supply of Oil Seal, Air Seal Ring and Trunion Bushing for grinding Roller Assembly of Coal Mill XRP 1003 for 1x500 MW, HTPS, KWB. | 1207140/- | 12075/- | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25089 |
| 04:30PM | 04:00PM |
| BM-III/ T- 395/ 2024 RFX No. 8100038925 |
22
| ACE (S&P) | 1296/2024 | Deployment of One No. SUV (0-1 year) for E.E. WS&G & E.E. CHIO, 1x500 MW, HTPS, Korba West. | 1256522.40 | 6285/- | 03/10/2024 04:00PM | 03/10/2024 04:30PM | 25081 |
| 04:30PM | 04:00PM |
| Hiring/ CHIO/ T - 2263/ 2024 Rfx No. 8100038922 |
23
| ACE (S&P) | 1295/2024 | Rewinding of various rating 0.4KV LT Motors installed at CHP: INT, 4x210 MW, HTPS, Korba West. | 669001/- | 6690/- | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25000 |
| 04:30PM | 04:00PM |
| CHP EM/ T - 2261/ 2024 Rfx No. 8100038725 |
24
| ACE (S&P) | 021-1710/CHP:INT/UTW-6057/2024/ 3822 | Tender for “Supply & installation of heavy duty exhaust fan along-with laying of cable, powering at the three different floors of new crusher house, CHP-Internal, HTPS, CSPGCL, Korba West | 269818.8 | 2700.00 | 03/10/2024 04:00PM | 03/10/2024 04:30PM | 25092 |
| 04:30PM | 04:00PM |
| RFx No. 8100038860 |
25
| ACE (S&P) | 1301/2024 | Supply of Basket Assembly for Tecpro Systems Ltd., Pune make Travelling Water Screen which handles river water and installed at intake of CW PH of 4x210 MW Units, HTPS, Korba West. | 1246743.75 | 12470/- | 15/10/2024 04:00PM | 15/10/2024 04:30PM | 25247 |
| 04:30PM | 04:00PM |
| TM-II/ T - 2280/ 2024 Rfx No. 8100039356 |
26
| ACE (S&P) | 1301/2024 | Deployment of One No. Vehicle SUV (Earlier Jeep) for Office Work of E.D. (Gen.), HTPS, Korba West. | 603187.20 | 6032/- | 10/10/2024 04:00PM | 10/10/2024 04:30PM | 25246 |
| 04:30PM | 04:00PM |
| ED (Gen.)/T-2279/2024 Rfx No. 8100039343 |
27
| SE(Ash Handling-II) 1x500MW | SE(AH-II)/HTPS/UTP-120/479, Korba west dtd:- 20.09.2024 | Supply for Different Sizes of V Belts for Ash Handling Plant of 1x500 MW, HTPS, KW. | 187783.94 | 0.00 | 11/10/2024 04:00PM | 11/10/2024 04:30PM | 25245 |
| 04:30PM | 04:00PM |
| |
28
| ACE (S&P) | 1300/2024 | Repairing of damaged return rollers (H-3) of CHP: External, HTPS, Korba West. | 1177640/- | 11780/- | 10/10/2024 04:00PM | 10/10/2024 04:30PM | 25237 |
| 04:30PM | 04:00PM |
| CHEM/ T - 2278/ 2024 Rfx No. 8100039349 |
29
| ACE (S&P) | 1300/2024 | Annual Medical Examination of Officers & Employees of HTPS, Korba West. | 1086642.50 | 10870/- | 09/10/2024 04:00PM | 09/10/2024 04:30PM | 25236 |
| 04:30PM | 04:00PM |
| Hosp/ T - 2277/ 2024 Rfx No. 8100039140 |
30
| SE(Turbine-III)1x500 | 17-72/SE(Tur)/1x500MW/UTW-96/585 Date 18.09.2024 | Scope of work
1. Dismantling of external associated pipelines and removal of main hole covers of Ion Exchanger / Acid or Alkali Storage Tank. Removal of resin/ filter media and other internal of Ion Exchanger. Refitting of internals & Refilling of resin/filter media, fitting of main hole cover and external associated pipe lines of tanks, after rubber lining work will be done by contractor. 2. The contractor has to carryout the visual inspection, spark testing and the hardness testing of the existing rubber lining of the vessel in presence of Engineer in charge. If the existing rubber lining is found to be damaged or in poor condition then only the contractor is offered to carryout the complete rubber lining or repairing of the damaged area whatever the case may be. The contractor has to arrange spark testing machine and hardness testing machine for this purpose. No extra payment will be made to the contractor for this purpose. 3. Removal of old rubber lining from the equipment & repairing of tank/ pipelines/ bends etc. The contractor has to erect scaffolding/ support platform inside the vessel if required. Scaffolding material has to be arranged by the contractor. 4. Mechanical removal of old rubber lining shall be allowed. Heating or burning of the old rubber lining for removal will not be allowed due to environmental reason. 5. After removal of old rubber lining by scrapping, all the remaining traces of the old rubber lining on the metal surface of the tank should be removed by grinding. 6. The contractor has to arrange for proper ventilation inside the vessel, by means of electric fans, with proper earthlings arrangement. All electrical equipments to be used by the contractor should be BIS marked and contractor to get the earthling arrangement of all electrical equipments checked by CSPGCL Engineer. 7. The contractor has to made arrangement for the proper lighting inside the vessel. Contractor has to bring 24V bulb with holder 24V step-down transformer, wire and extension board, with wire of required length. 8. Surface preparation of welded joints of patch work areas are to be done by grinding by the contractor. Arrangement of grinder & wheel is under the scope of contractor. 9. Inspection of the metal surface to be done to ensure no sharp edges or grooves before applying the adhesive. 10. All the personnel protective equipment required for carrying out the surface cleaning & preparation process as above is to be arranged by the contractor. The contractor has to arrange temporary canopy (made of canvas cloth / tarpaulin) for the vessel in which the blasting is to be carried out so that the powdered particles do not spread out and hamper other activities of the plant. 11. After completion of surface cleaning & preparation process the contractor should get clearance from the Engineer in charge / site Engineer for surface roughness before proceeding further. 12. Adhesive solution to be applied to the cleaned / blasted surface as per Code of practice for lining of vessels and equipment for chemical process IS 4682: Part 1: 1999 of rubber lining. 13. Supply of finished quantity of natural rubber shall be under the scope of contractor. Re-rubber lining of various tanks & pipe line etc. as per IS-4682, Part-I, 1999 Code of practice for lining of vessels and equipment for chemical processes Part-I Rubber Lining. Rubber lining of tanks/pipes etc. with natural rubber should be carried out in 02 plies each ply of 03 mm thick. i.e. total thickness of rubber lining should be 06 mm. Only for pipes of ID less than 80 mm finished thickness of 3 mm sheet will be allowed. 14. For patch work of small area of tank, cold bonding process may be applied. 15. Scrap rubber is to be disposed off as per instructions of Engineer-in-charge. The work site shall be cleaned after completion of work .The Scrap rubber may be taken back by the Contractor out of plant premises for their own use. 16. The firm shall maintain a progressive record of the work. The work execution sheet shall be got signed by the representative of the firm at site and the Site Engineer (TMD-II, BOP) after completion of each job. The same shall be submitted along with Bill for verification and record purpose. 17. The firm shall have hardness tester tool at site and the quality of the rubber shall to be ensured at site before start of each work as per requirement of the Engineer In Charge. 18. Re-rubber lining of tank, container, piping to be done which are handling HCL 30 % and H2SO4 (40%) under atmospheric temp and pressure condition. 19. The quantity of re-rubber lining as shown in enquiry schedule is tentative only. The actual quantity of work to be carried out may vary and depends on availability of equipment for the work, healthiness of plant etc. 20. Electricity, steam, and air required will be provided by CSPGCL free of cost. For tapping of air and steam, the contractor has to arrange rubber hoses, pipe fittings, and valves of required sizes. 21. The labours employed by the contractor should be physically and medically fit for the work inside and outside the tank. 22. TESTING: The rubber and Adhesive to be used should satisfy the following checks before commencement of work (A) Natural rubber sheet for lining work should be resistant to 30 % concentrated HCL acid at 45 deg C. The contractor has to submit a test certificate of every lot of the natural rubber sheet to be used from a Govt. approved lab as per IS: 4682 (Part-1)-1999 or the latest version to the Engineer-In-Charge. On receipt of the natural rubber sheet samples will be taken on random basis. The contractor will be responsible for getting the samples tested by Govt. approved lab for rubber quality and adhesion and submit the test report to Engineer in charge. The decision to accept the lot of natural rubber supplied will be decided by the Engineer in charge. The test will be carried out by dipping the rubber samples in 30 % concentrated HCL for 24 hrs. (B) BONDING TEST: The Adhesive to be used for bonding of rubber to metal (Mild steel vessels and pipe lines) and the rubber supplied by the contractor shall be of # Chemloc or equivalent grade. The contractor has to submit a test certificate from a Govt. approved lab for adhesion test as per IS: 4682 (Part#1) 1999 or the latest version for the bonding of the natural rubber to the metal sample piece. The contractor should carry out the bonding test of sample piece at site on the sample piece prepared by him. (C) CONTINUITY TEST: On completion of rubber lining the lining should be checked by high frequency spark testing equipment in presence of CSPGCL Engineer.
TECHNICAL DATA SHEET FOR NATURAL RUBBER TO BE SUPPLIED BY THE CONTRACTOR FOR RERUBBER LINING WORK 01. Thickness of natural rubber sheet = 3 mm, Resistant to 30% con. HCL at 45 deg. C, as per IS: 4682 part-1. 02. Thickness of natural rubber lining=6 mm, two plies of 03 mm sheet to be applied. 03. Rubber sheet bonded to metal surface shall be as per norms. [D] TERMS AND CONDITIONS: 1) All tools & tackles welding machine, electrodes, gas, manpower & safety equipment required, Natural rubber sheet, Adhesive of good quality, High frequency spark testing equipment, Shore A hardness tester, Tools for rubber removal and application, Surface finishing equipment & its raw material and necessary equipment, any other tools and tackles required for completion of above job shall be arranged by the contractor at their own cost. 2) For commencing re-rubber lining work of tanks /pipelines/bends etc., Job /work may be at site in assembled/disassembled condition, and the same will be intimated to the firm in emergency/advance, so that team can be deputed for the job. Work may be done in assembled or dissembled condition of job. 3) Complete quantity of raw rubber sheet, solution and gasket will be arranged by the contractor. 4) Complete re-rubber lining work shall be done at the sites of HTPS Plant, safe disposal of old rubber have to be confirmed by the contractor. 5) The job would be guaranteed for a period of three years of any defects and poor workmanship from the date of commissioning of equipment. 6) The equipment shall be spared for rubber lining work as per operational availability and the same can be changed as per the decision of Chief Chemist/ Engineer-in-charge. 7) Joint inspection will be carried out after completion of re-rubber lining work by the site Engineer & Sr. Chemist/ Chief Chemist. 8) The Contractor shall strictly follow the rules laid down by the Deptt. of labour and the Director Industrial Health & Safety, Govt. of C.G. 9) The contractor shall be fully responsible for the safety of his workers and shall provide all the safety appliances to his workers. 10) Any mishap/accidents occurs due to non compliance of safety rules and regulations as laid down by Govt., all the compensation & penalty shall be borne by the contractor. 11) RIGHT OF OWNER TO DETERMINE / TERMINATE THE CONTRACT: If the contractor is not able to meet any of the commitment as per the contact, CSPGCL will free to terminate the contract and get the balance work carried out by any other suitable agency at Contractors risk and cost. 12) The contractor shall make their own arrangement for the security of their material stored at site. 13) Accommodation, travel, food, & all other expenses, overheads shall be arranged by the contractor by their own means and cost. 14) In case of emergency work the firm shall be available at site within 24 hrs of intimation to attend the emergency. 15) GST: Shall be paid as per prevailing GST rate & rules of Central Govt. Contractor shall provide its GSTN No. as per rule. 16) Compliance of Form -14 & 21 & other necessary compliance of labour & safety depart. of Govt. of C.G. along with police verification of deputed labours/supervisor shall be made by contractor for the execution of said work before preparation of gate pass. 17) Labour payment shall be done through Bank only and Bank statement regarding labour payment shall be submitted along with bill duly verified by site Engineer (CSPGCL), EPF, ESIC certificate etc. shall be produced / made available by firm. 18) These conditions of tender shall also form part of the contract and any breach of the terms of this tender shall be deemed to be a breach of the contract.
CSPGCL INPUT 1. Steel/ MS plate, pipes flanges for repairing work shall be provided. 2. Steam, air water & electricity shall be provided free of cost. 3. Stores facilities for rubber adhesives etc. shall be provided. 4. Mobile crane facility shall be provided during dismantling/refitting of tanks.
CONTRACTORS INPUT 1. Required natural rubber for finished quantity, all tools and tackles, adhesives. All the materials/equipment required for surface preparation for shot blasting by steel scrap / Cu or Al slag, grinding machine, exhaust fan, air hoses, scaffolding material, wooden planks, rope ladder, Tarpaulin/Canvas cloth for canopy, personal protective equipments etc required for the rubber lining process will be in the contractors scope.
SE (Turbine) 1x500 MW, HTPS, CSPGCL, KWB | 147500.00/- | 1500.00/- | 10/10/2024 03:00PM | 11/10/2024 04:00PM | 25228 |
| 04:00PM | 03:00PM |
| Cold repairing work along with required material of rubber lining in different beds and bulk chemical storage tank in DM plant and CPU of 1x500MW, HTPS, Korba West. |
31
| SE(Ash Handling-II) 1x500MW | SE(AH-II)/HTPS/UTP-119/474, Korba west dtd:-19.09.2024 | Supply of Neoprene Rubber Gasket 200NB/250NB/300NB of Sleeve Coupling for Ash Handling Plant of 1x500 MW, HTPS, KW. | 179360.00 | 0.00 | 10/10/2024 04:00PM | 10/10/2024 04:30PM | 25227 |
| 04:30PM | 04:00PM |
| |
32
| S.E.(ET-II), O&M-I, KW | 021-18/ EMD-I/UPTP-171/1657 Dt. 18.09.2024 | Supply of Surge Arrester for Interconnecting Transformer | 174262.40 | 0.00 | 11/10/2024 03:00PM | 11/10/2024 04:15PM | 25226 |
| 04:15PM | 03:00PM |
| |
33
| ACE (S&P) | No. 021-10/C&I-I/UTP-1953/2024 | Supply of 50 Pair X 0.5mm2 of JFC Armoured Telephone cables for local wired telephone connection with EPABX Telephone Exchange at entire plant (4X210MW, 1X500MW) & HTPS Plant colony premises and through over the PLCC communication for day to day maintenance works pertaining to communication Division HTPS, CSPGCL, Korba West. | 356171.00 | 3562.00 | 11/10/2024 04:00PM | 11/10/2024 04:30PM | 25222 |
| 04:30PM | 04:00PM |
| RFx No. 8100039146 |
34
| ACE (S&P) | No. 021-10/CHP: Ext./UTW-5687/2024/4065 | Tender for “Repair /Rewinding of 33/0.4KV 500KVA, Transformers Installed at CHP: Ext, HTPS, Korba West.” | 212400.00 | 2125.00 | 08/10/2024 04:00PM | 08/10/2024 04:30PM | 25219 |
| 04:30PM | 04:00PM |
| 8100039310 |
35
| ACE (S&P) | 021-10/MISC/UTP-140/2024 | Supply of Toner cartridge and Drum cartridge for Xerox make B1022 Photocopy machine and Cartridge for SHARP5620S photocopy machine. | 54604.00 | 00 | 07/10/2024 04:00PM | 07/10/2024 04:30PM | 25212 |
| 04:30PM | 04:00PM |
| 8100039305 |
36
| ACE (S&P) | No.021-10/Misc/UTW-141/2024 | Providing assistance services for ORT-I, & ORT-II by deploying Peons under O/o Addl.C.E.(O&M-I), 4x210MW, CSPGCL, HTPS, Korba West. | 430440.40 | 4305/- | 07/10/2024 04:00PM | 07/10/2024 04:30PM | 25207 |
| 04:30PM | 04:00PM |
| RFx No. 8100039238 |
37
| SE (Elec & Test-I) O&M-I | 021-07/HTPS/EMD-II/UTP/5304/1659 | Supply of "different watts halogen fittings/ halogen lamps/PVC insulated aluminum wires" | | | 07/10/2024 03:00PM | 08/10/2024 04:00PM | 25206 |
| 04:00PM | 03:00PM |
| |
38
| SE (CHP Int Opn) | 021-1446/CHPIO/WSG/UTW-08/24-25/2914, Korba West, dated 13.09.2024 | Repairing and Maintenance of Fire Tender CG 12 ZC 2273. | | 2000 | 08/10/2024 03:00PM | 08/10/2024 04:30PM | 25204 |
| 04:30PM | 03:00PM |
| |
39
| SE(S&SC) | 021-91/SE(S&SC)/UTP-05/700/ Korba West dated 13-09-24 | Procurement od Alcohol Analyzer for HTPS Korba West | 191962.40 | | 03/10/2024 03:00PM | 03/10/2024 03:30PM | 25198 |
| 03:30PM | 03:00PM |
| 0 |
40
| ACE (S&P) | No.021-10/Misc/S&P/UTP-139/2024 | Supply of A-4 size paper 76 GSM JK red for computer printers & photocopy M/c for O/o Addl. C.E.(S&P), HTPS, Korba West. | 94976.00 | | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25195 |
| 04:30PM | 04:00PM |
| RFx No. 8100039200 |
41
| ACE (S&P) | 1239/2024 | Procurement of Coal diffuser pipe for coal burners 210 MW, ABL Boiler of Unit No. 3 & 4, HTPS, Korba West. | 800040/- | 8000/- | 27/09/2024 04:00PM | 27/09/2024 04:30PM | 24918 |
| 04:30PM | 04:00PM |
| BM-II/ T - 2254/ 2024 Rfx No. 8100038476 |
42
| ACE (S&P) | 021-10/HBHPS/UTW-6058/2024 | Work contract for testing of tension string insulators of 132KV voltage class feeder and line of 132KV/ 33 KV switchyard and transformer yard at HBHPS, Machadoli | 467020/- | 4670/- | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25186 |
| 04:30PM | 04:00PM |
| 8100039195 |
43
| SE (Elect & Test) | SE/ET-III/1x500MW/TW-165/EMD-S/2024/706 dt.11.09.2024 | Regarding Tender Inviting Notice for Cleaning & Painting of LT SGWR Panel at 1x500MW,KWB. | 191160.00 | 1912.00 | 04/10/2024 03:00PM | 04/10/2024 04:15PM | 25185 |
| 04:15PM | 03:00PM |
| |
44
| ACE (S&P) | 1299/2024 | Laying Fabrication & Erection of pipe pedestal, dismantling of 350NB Ash disposal line and fabrication erection of Tee, Dummy and Bend at Jhabu ash dyke, HTPS of Ash Handling Div-I, HTPS, KWB. | 1487980/- | 14880/- | 01/10/2024 04:00PM | 01/10/2024 04:30PM | 25182 |
| 04:30PM | 04:00PM |
| AH-I/ T-2276/ 2024 Rfx No. 8100039132 |
45
| SE (Elec & Test-I) O&M-I | 021-07/HTPS/EMD-II/UTW/5459/1635 | Laying of power and control cables at ESP under EMD-II, SE (ET-I), PH-I, HTPS, KW | 191128 | 1911 | 03/10/2024 04:00PM | 04/10/2024 03:00PM | 25181 |
| 03:00PM | 04:00PM |
| |
46
| ACE (S&P) | 1299/2024 | AOH Package of fans of 210 MW, BHEL Make Boiler of U#1, HTPS, Korba West. | 1025931.21 | 10260/- | 03/10/2024 04:00PM | 03/10/2024 04:30PM | 25180 |
| 04:30PM | 04:00PM |
| BM-I/ T - 2275/ 2024 Rfx No. 8100039194 |
47
| ACE (S&P) | 1299/2024 | AOH Package of ESP of 2x210MW, BHEL Make Boiler of U#1, HTPS, Korba West. | 847385.86 | 8475/- | 01/10/2024 04:00PM | 01/10/2024 04:30PM | 25179 |
| 04:30PM | 04:00PM |
| BM-I/ T- 2274/ 2024 Rfx No. 8100039193 |
48
| ACE (S&P) | 1299/2024 | Providing Expert Technical electrical technician for 0.4/ 6.6 KV breaker maint. control circuit checking and electrical protection testing of associated electrical system of CHP: INT, 4x210 MW, HTPS, Korba West. | 612674.88 | 6130/- | 01/10/2024 04:00PM | 01/10/2024 04:30PM | 25178 |
| 04:30PM | 04:00PM |
| CHP EM/ T - 2273/ 2024 Rfx No. 8100039192 |
49
| ACE (S&P) | 1293/2024 | Procurement of High Chrome Steel Conical Impellers of Coal Burners of ABL Boilers of Unit No. 3 & 4, HTPS, Korba West. | 1121147.50 | 11215/- | 26/09/2024 04:00PM | 26/09/2024 04:30PM | 24917 |
| 04:30PM | 04:00PM |
| BM-II/ T- 2253/ 2024 Rfx No. 8100038477 |
50
| ACE (S&P) | 297/2024 | Supply of Bull Clamping Ring and Bowl Extension Ring of Coal Mill XRP 1003 at 1x500 MW, HTPS, Korba West. | 1274941.03 | 12750/- | 03/10/2024 04:00PM | 03/10/2024 04:30PM | 25172 |
| 04:30PM | 04:00PM |
| BM-III/ T- 404/ 2024 RFX No. 8100039177 |
51
| ACE (S&P) | 297/2024 | Deployment of One No. Vehicle SUV (Earlier Jeep) for day to day work of S.E. (AH-II), O/o ACE (O&M-II), 1x500 MW, HTPS, KWB. | 1307098.80 | 6536/- | 03/10/2024 04:00PM | 03/10/2024 04:30PM | 25171 |
| 04:30PM | 04:00PM |
| AH-II/ T- 403/ 2024 RFX No. 8100039120 |
52
| ACE (S&P) | No. 021-10/E&T-I/UTP-2470/2024 | Supply of 95KV DC Peak Wall through bushing for ESP under EMD-II, SE(ET-I), PH-I, HTPS, Korba West. | 390757.00 | 3910.00 | 26/09/2024 04:00PM | 26/09/2024 04:30PM | 24857 |
| 04:30PM | 04:00PM |
| RFx No. 8100038301 |
53
| ACE (S&P) | 1298/2024 | Procurement of Inter cooler and after cooler tube bundle assembly for kirloskar make T-BTD-JM Air Compressor of 4x210 MW, HTPS, Korba West. | 1295923.20 | 12960/- | 30/09/2024 04:00PM | 30/09/2024 04:30PM | 25164 |
| 04:30PM | 04:00PM |
| TM-I/ T - 2272/ 2024 Rfx No. 8100039112 |
54
| ACE (S&P) | 1298/2024 | Supply of different type LED Fittings for EMD-II, PH-II, HTPS, Korba West. | 918714.40 | 9190/- | 01/10/2024 04:00PM | 01/10/2024 04:30PM | 25163 |
| 04:30PM | 04:00PM |
| E&T-II/ T - 2271/ 2024 Rfx No. 8100039139 |
55
| ACE (S&P) | 1298/2024 | Deployment of One No. Vehicle SUV (Earlier Jeep) for day to day work of S.E. (S&SC), HTPS, Korba West. | 1307098.80 | 6536/- | 01/10/2024 04:00PM | 01/10/2024 04:30PM | 25161 |
| 04:30PM | 04:00PM |
| S&SC/ T - 2270/ 2024 Rfx No. 8100039096 |
56
| ACE (S&P) | 1297/2024 | Repairing of Cranes/ Hydras of WS&G Div., HTPS, Korba West. | 945242.02 | 9455/- | 30/09/2024 04:00PM | 30/09/2024 04:30PM | 25160 |
| 04:30PM | 04:00PM |
| CHIO/ T - 2269/ 2024 Rfx No. 8100039100 |
57
| ACE (S&P) | 1297/2024 | Procurement of Carrying Roller, H-1 for CHP: EXT., HTPS, Korba West. | 1433700/- | 14340/- | 30/09/2024 04:00PM | 30/09/2024 04:30PM | 25159 |
| 04:30PM | 04:00PM |
| CHP MM/ T - 2268/ 2024 Rfx No. 8100039076 |
58
| ACE (S&P) | 1297/2024 | Procurement of 70 Watt LED well glass fittings, 24W LED batten Tube rod and ceiling fan for CHP:INT/EXT., HTPS, Korba West. | 829864.50 | 8300/- | 30/09/2024 04:00PM | 30/09/2024 04:30PM | 25158 |
| 04:30PM | 04:00PM |
| CHEM/ T - 2267/ 2024 Rfx No. 8100039074 |
59
| ACE (S&P) | 1295/2024 | Providing Highly Skilled/ Experienced Electrical Technician and Assistance Technician for Breaker Maintenance Control Circuit, Relay & Protection Circuit Checking of A and B stream at CHP: Ext., HTPS, Korba West. | 593882.52 | 5940/- | 19/09/2024 04:00PM | 19/09/2024 04:30PM | 24999 |
| 04:30PM | 04:00PM |
| CHP EM/ T - 2260/ 2024 Rfx No. 8100038724 |
60
| ACE (S&P) | No.021-2x660MW/Misc/SCTPP/UTW-02/2024 | Tender Work for “Assistance in office work by the help of Computer operators at O/o Project Manager(2x660MW), SCTPP, CSPGCL, Korba West”. | 419256.05 | 4193 | 27/09/2024 04:00PM | 27/09/2024 04:30PM | 25141 |
| 04:30PM | 04:00PM |
| RFx No. 8100039123 |
61
| ACE (S&P) | No.021-2x660MW/Misc/SCTPP/UTW-01/2024 | Tender work for “Assistance services (Peon) in office day to day work at O/o Project Manager, 2x660MW, SCTPP, CSPGCL, Korba West”. | 351658.90 | 3517 | 27/09/2024 04:00PM | 27/09/2024 04:30PM | 25140 |
| 04:30PM | 04:00PM |
| RFx No. 8100039122 |
62
| ACE (S&P) | 021-10/Misc/UTP- 132/2024 | procurement of Office Table and Chair for ministerial Staff working under Dy. G.M. (F&A) O/o Addl. CE (T&SS), HTPS, Korba West | 279961.00 | 2800/- | 16/09/2024 04:30PM | 16/09/2024 04:30PM | 24819 |
| 04:30PM | 04:30PM |
| 8100038275 |
63
| SE (Elect & Test) | SE/ET-III/1X500MW/TW-164/EMD-M/2024/680 dtd.05.09.2024 | Work for Servicing of ESP Panels during short down at 1x500MW, HTPS, KWB. | 179011.00 | 1790.00 | 26/09/2024 03:00PM | 26/09/2024 04:15PM | 25129 |
| 04:15PM | 03:00PM |
| |
64
| SE (Proc-I) O/o Addl. CE(S&P) | No. 021-10/Misc/UTW-137/2024 | Tender work for “Assistance service (Peon) in day-to-day work of O/o Addl. CE (FM), HTPS, Korba West". | 367125.58 | 3672 | 24/09/2024 04:00PM | 24/09/2024 04:30PM | 25113 |
| 04:30PM | 04:00PM |
| RFx No. 8100038999 |
65
| ACE (S&P) | 021-10/TM-I/UTW-3293/2024/3853 | Tender For Work of “APPLICATION OF FIRE RESISTANT CERAMIC PAD INSULATION FOR HPT & IPT MODULE” OF 4X210MW, HTPS, Korba West. | 472751.30 | 4730.00 | 20/09/2024 04:00PM | 20/09/2024 04:30PM | 25106 |
| 04:30PM | 04:00PM |
| Rfx No. 8100038951 |
66
| ACE (S&P) | 296/2024 | Assistance services in Office Computer Work at Various circles under O/o ACE (O&M-II), HTPS, Korba West. | 1053820.80 | 10540/- | 23/09/2024 04:00PM | 23/09/2024 04:30PM | 25105 |
| 04:30PM | 04:00PM |
| O&M-II/ T- 402/ 2024 RFX No. 8100039000 |
67
| SE (CHP Int Opn) | 021-1420/CHIO/154/UTP-07/2725 Dt. 30.8.2024 | Supply & Installation of Multi color Bakelite Display Flex board for CHIO 4x210MW & 1x500MW KWB. | 33974.64 | 0 | 20/09/2024 04:00PM | 20/09/2024 04:30PM | 25101 |
| 04:30PM | 04:00PM |
| Offline Tender |
68
| SE (Elect & Test) | SE/ET-III/1x500MW/TP-208/EMD-S/2024/646 dt.30.08.2024 | Procurement of Consumable Item for EMD-I (SWGR) at 1x500MW,KWB. | 194815.40 | 0 | 24/09/2024 03:00PM | 24/09/2024 04:15PM | 25100 |
| 04:15PM | 03:00PM |
| |
69
| ACE (S&P) | 295/2024 | Onsite Offline Calibration of 400 KV CT associated with ABT Energy Meter Og Generator Transformer and Station Transformer of 1x500 MW, HTPS, Korba West. | 730125/- | 7305/- | 20/09/2024 04:00PM | 20/09/2024 04:30PM | 25095 |
| 04:30PM | 04:00PM |
| ET-III/ T- 400/ 2024 RFX No. 8100038936 |
70
| ACE (S&P) | 295/2024 | Painting of Complete Structure of Elecon make stacker cum re-claimer M/c No. HM-505 & HM-174 and BCN 7B & Conveyor No. 7 installed at CHP: INT (1x500 MW & 4x210 MW), HTPS, Korba West. | 867465.20 | 8680/- | 21/09/2024 04:00PM | 21/09/2024 04:30PM | 25093 |
| 04:30PM | 04:00PM |
| CHP MM/ T- 398/ 2024 RFX No. 8100038938 |
71
| ACE (S&P) | 294/2024 | Procurement of Thordon SXL Rough Moulded Tubes for bush bearing in vertical pumps for Turbine, 1x500 MW, HTPS, Korba West. | 853612/- | 8540/- | 21/09/2024 04:00PM | 21/09/2024 04:30PM | 25088 |
| 04:30PM | 04:00PM |
| TM-III/ T- 394/ 2024 RFX No. 8100038930 |
72
| SE(Ash Handling-II) 1x500MW | SE(AH-II)/HTPS/UTW-118/401, Korba west dtd:-29.08.2024 | Cleaning of Rain Drain Trench in front of Ash Pump House up to EMD-III shed and Transportation of Waste Material/Ash/Garbage etc. of 1x500 MW, Plant HTPSKWB. | 186562.70 | 1870.00 | 20/09/2024 04:00PM | 20/09/2024 04:30PM | 25085 |
| 04:30PM | 04:00PM |
| |
73
| ACE (S&P) | 1296/2024 | Deployment of 03 Skilled manpower on contract basis for D.M. Plant & Drinking House of 4x210MW, HTPS, Korba West. | 685546.65 | 6860/- | 18/09/2024 04:00PM | 18/09/2024 04:30PM | 25084 |
| 04:30PM | 04:00PM |
| OPRN-I/ T-2266/ 2024 Rfx No. 8100038869 |
74
| ACE (S&P) | 1296/2024 | Assisting in material handling, counting & stacking and other store related works pertaining to O&M: Store of (4x210 MW & 1x500 MW), HTPS, Korba West. | 1214827.11 | 12150/- | 19/09/2024 04:00PM | 19/09/2024 04:30PM | 25083 |
| 04:30PM | 04:00PM |
| Store/ T - 2265/ 2024 Rfx No. 8100038921 |
75
| ACE (S&P) | 1296/2024 | Deployment of One No. SUV (7 Seated for 0 to 1 year) for E.E. (EMD-I and I&C-I), PH-I, HTPS, Korba West. | 1256522.40 | 6285/- | 18/09/2024 04:00PM | 18/09/2024 04:30PM | 25082 |
| 04:30PM | 04:00PM |
| Hiring/ E&T-I/ T- 2264/ 2024 Rfx No. 8100038923 |
76
| SE (Tur-II) BOP,O&M-I,KW | 021-17/HTPS/W3024UO462 / 3046, KW, dtd. 28.08.2024 | Supply of Welding and Cutting Accessories for day to day maintenance at Tur. Aux. Maint. Div. 4 X 210 MW, HTPS, Korba West | 168258.23 | | 18/09/2024 04:00PM | 18/09/2024 04:30PM | 25079 |
| 04:30PM | 04:00PM |
| |
77
| SE(Ash Handling-II) 1x500MW | SE(AH-II)/HTPS/UTP-117/400, Korba west dtd:-28.08.2024 | Supply of Non-Metallic Jointing Sheet of Different Thickness for Ash Handling Plant, 1x500 MW, HTPS, KWB. | 160857.60 | 0.00 | 19/09/2024 04:00PM | 19/09/2024 04:30PM | 25073 |
| 04:30PM | 04:00PM |
| |
78
| ACE (S&P) | 021-10/OPN-I/UTW-1755/2024/3692 | Tender for “Work to be carried out on contract basis at Express laboratory W.T. Plant HTPS Korba West for 365 days (For the Year 2024-25)”. | 492545.60 | 4930 | 13/09/2024 04:00PM | 13/09/2024 04:30PM | 25056 |
| 04:30PM | 04:00PM |
| 8100038851 |