Sr. No. | Tender Issuing Office | Tender Notice No. | Scope of Work | Estimated Cost(Rs.) | Earnest Money Deposit (Rs.) | Closing Date & Time for Submission of Tender | Date & Time of Opening of Tender | S.no | LINK | open time | Subm time | View Tender Document | Remark/RFx ID for e-Bidding |
1
| S.E.(AHP) | 15-22/ABVTPS/AHP/W/T-18/5138, Marwa, date-20.09.2024 | Work contract for servicing/overhauling & replacement of damaged spares and painting of 5 Ton capacity EOT crane with supply of material installed at vacuum pump house of Ash Handling Plant, 2x500MW, ABVTPS, Marwa . | 170510 | 1710 | 16/10/2024 01:30PM | 17/10/2024 03:30PM | 25295 |
| 03:30PM | 01:30PM |
| |
2
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/AHP/W/T-227/24 | Work contract for dismantling, re-erection & commissioning of dry fly ash unloading/ conveying system during COH of U#2 of AHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1466409.60 | 14700/- | 21/10/2024 03:30PM | 21/10/2024 04:00PM | 25289 |
| 04:00PM | 03:30PM |
| 8100039486 |
3
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-169/24/2072 | Supply and distribution of Jaggery (Gur) for technical staff posted in 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 848800/- | 8500/- | 04/10/2024 03:30PM | 04/10/2024 04:00PM | 24839 |
| 04:00PM | 03:30PM |
| 8100038166 |
4
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/T-200/24/2510 Marwa, dtd. 30.08.2024 | Work contract for Supply and Installation of CRCA sheet powder coated enclosure for solenoid valves of pneumatic actuators installed at Boiler area of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 466100 | 4670 | 03/10/2024 03:30PM | 03/10/2024 04:00PM | 25110 |
| 04:00PM | 03:30PM |
| 8100038911 |
5
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-199/24/2470 | Work contract for Display Boards and Wall Painting of SOP of Fire Extinguishers & Equipment’s and instructions during fire emergency at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 491352/- | 4950/- | 04/10/2024 03:30PM | 04/10/2024 04:00PM | 25076 |
| 04:00PM | 03:30PM |
| 8100038868 |
6
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-225/24 | Work contract for cleaning ESP Pass at 27.5 mtr at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 305761.60 | 3100/- | 15/10/2024 03:30PM | 15/10/2024 04:00PM | 25268 |
| 04:00PM | 03:30PM |
| 8100039397 |
7
| S.E.(Civil) Circle-I | 005-7800/Tend./ABVTPS/517 Marwa Dtd. 23.09.2024 | Urgent work of replacement of broken cement concrete tiles of upstream slope of Raw water reservoir of 2x500MW, ABVTPS Marwa. | 198400.00 | 2000.00 | 14/10/2024 04:00PM | 14/10/2024 04:15PM | 25267 |
| 04:15PM | 04:00PM |
| Tender Espcn. No. SEC-I/ABVTPS/2024/T-24 |
8
| S.E.(AHP) | No. 15-22/ABVTPS/AHP/W/T-17/5137 Marwa Date 20.09.2024 | Work Contract for fabrication & erection of big size MS Gate Nera AHP control room & ESP U# 1 of Ash Handling PLant, ABVTPS, Marwa. | 199420 | 1995 | 17/10/2024 03:30PM | 17/10/2024 03:30PM | 25259 |
| 03:30PM | 03:30PM |
| |
9
| Addl. Chief Engineer (S&P) | 15-06/S&P/P/W/TN-120/24/T-185/24/2395 Marwa, dtd. 20.08.2024 | Supply of "Bull Clamping Ring (4 SEG/SET) & Air Seal Ring of XRP 1003 Mill at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1452285 | 14550 | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25032 |
| 04:00PM | 03:30PM |
| 8100038699 |
10
| S.E.(Boiler) | 15-17/ABVTPS/BOILER/W/T-01/5121 | Fabrication of Platform to increase the APH Floor area of Boiler Unit#02, 2x500MW, ABVTPS, Marwa | 186346.00 | | 16/10/2024 03:00PM | 17/10/2024 03:30PM | 25248 |
| 03:30PM | 03:00PM |
| |
11
| S.E.(AHP) | 15-22/ABVTPS/AHP/P-T-25/5111 | Procurement of Pneumatic Hose, PU tube, and Pressure gauges for AHP(C&I) of 2X500 MW ABVTPS, CSPGCL, Marwa | 188227.70 | | 15/10/2024 03:30PM | 15/10/2024 04:00PM | 25244 |
| 04:00PM | 03:30PM |
| |
12
| S.E.(OPRN) | 15-20/ABVTPS/oprn./W-T-05/9441 Marwa dtd.12/09/2024 | One Time Cleaning of Water/Steam/Oil pipe line inside TG Building and associated with Turbo Generator of Unit#1 and Unit#2 at 2 X 500MW, ABVTPS, Marwa, CSPGCL. | | 1965 | 10/10/2024 03:00PM | 10/10/2024 03:30PM | 25240 |
| 03:30PM | 03:00PM |
| |
13
| S.E.(Boiler) | 15-17/ABVTPS/Boiler/P/T-19/4995 | Procurement of In Situ Mold Slick for Boiler of 2x500MW, ABVTPS, Marwa, Janjgir-Champa. | | | 15/10/2024 03:30PM | 15/10/2024 03:30PM | 25233 |
| 03:30PM | 03:30PM |
| |
14
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/T-224/24/2729 dtd. 19.09.24 | Work contract for Rewinding of LT motors (3ph,415v) installed in BOP/BTG area of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 924214 | 9300 | 18/10/2024 03:30PM | 18/10/2024 04:00PM | 25229 |
| 04:00PM | 03:30PM |
| 8100039283 |
15
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-210/24/2716 | Work Contract for Assistance in Operation activities, Shifting of material and other miscellaneous works round the clock in three (03) shifts at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1096219.10 | 11000/- | 14/10/2024 03:30PM | 14/10/2024 04:00PM | 25225 |
| 04:00PM | 03:30PM |
| 8100039077 |
16
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-211/24/2716 | Supply and application of epoxy painting for ESP outlet duct column & Structure of Unit#02 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1033728/- | 10350/- | 14/10/2024 03:30PM | 14/10/2024 04:00PM | 25224 |
| 04:00PM | 03:30PM |
| 8100039078 |
17
| S.E.(AHP) | 15-22/ABVTPS/AHP/P/T-24/5077 DTD 18.09.2024 | Procurement for 35W LED well glass fitting for AHP at 2X500 MW ABVTPS, CSPGCL MARWA | 190829.60 | 0.00 | 11/10/2024 04:00PM | 11/10/2024 04:30PM | 25223 |
| 04:30PM | 04:00PM |
| |
18
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-190/24/2423 | Supply of Ceramic Lagging of Boom Conveyor Drive pulley and take up pulley of Stacker-Cum-Reclaimer 1&2 installed at Coal Handling Plant, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 501000/- | 5010/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25053 |
| 04:00PM | 03:30PM |
| 8100038782 |
19
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-221/24/2713 | Cleaning & Transportation of Ash from Flue Gas Duct of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 492414/- | 4950/- | 10/10/2024 03:30PM | 10/10/2024 04:30PM | 25221 |
| 04:30PM | 03:30PM |
| 8100039243 |
20
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-183/24 | Work Contract for painting of ESP hopper supporting structure and associated equipment’s installed at both unit#01 & 02 of AHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa along with supply of Polyurethane Paint & Epoxy Primer. | 1487119.07 | 14880/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25048 |
| 04:00PM | 03:30PM |
| 8100038775 |
21
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/T-223/24/2715 dtd. 18.09.2024 | Work contract for Road Light Electrification from Ambulance room to STP of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 267661 | 2680 | 14/10/2024 03:30PM | 14/10/2024 04:00PM | 25220 |
| 04:00PM | 03:30PM |
| 8100039280 |
22
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-222/24/2685 | Work contract for daily collection of spilled HSD, HFO at FOPH and other Lubrication system of BTG area at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 389455/- | 3900/- | 09/10/2024 03:30PM | 09/10/2024 04:00PM | 25203 |
| 04:00PM | 03:30PM |
| 8100039245 |
23
| Addl. Chief Engineer (S&P) | 15-06/S&P/P/W/TN-120/24/T-186/24/2395 Marwa, dtd. 20.08.2024 | Deployment of skilled labours to assist in Operation activities of Unit#1 and Unit#2 round the clock in three shift daily at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1122109.20 | 11250 | 20/09/2024 03:30PM | 20/09/2024 04:00PM | 25033 |
| 04:00PM | 03:30PM |
| 8100038705 |
24
| S.E.(AHP) | 15-22/ABVTPS/AHP/W/T-16/9444 DTD 12.09.2024 | Supply , installation, commissioning and testing of 4 No's Exhaust fan at AHP for HCSD pump house of AHP at 2X500MW, ABVTPS, CSPGCL, Marwa, janjgir-champa | 199797.60 | 2000 | 04/10/2024 04:00PM | 04/10/2024 04:30PM | 25197 |
| 04:30PM | 04:00PM |
| |
25
| S.E.(E&T) | No. 15-15/ABVTPS/E&T/W/T-09/4908 MARWA,DATE, 11/09/2024 | Supply and fixing of street light pole bracket double overhang on existing street light pole installed at newly constructed playground of CSPGCL colony 2x500MW,ABVTPS,Marwa. | | 0/- | 08/10/2024 03:30PM | 08/10/2024 03:30PM | 25196 |
| 03:30PM | 03:30PM |
| |
26
| Addl. Chief Engineer (T&SS) | 15-08/T&SS/ABVTPS/P/T-01/2024/530 | Procurement of X-ray Chest Stand & X-ray Safety Items for ABVTPS Hospital, Marwa | 59260.00 | 0 | 11/10/2024 03:30PM | 11/10/2024 04:00PM | 25194 |
| 04:00PM | 03:30PM |
| |
27
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/P/T-11/9443 dt: 12.09.2024 | Procurement of Analog Mixed 12-Bit card for VAM(Vapor absorption Machine) of2x500 MW, ABVTPS, CSPGCL, Marwa | | 0 | 10/10/2024 03:30PM | 10/10/2024 03:30PM | 25193 |
| 03:30PM | 03:30PM |
| |
28
| SE (Civil) CMDC | S.E.(C)/CMDC/GP-III/T/24-25/T-13 | Hiring of one Number jeep with admissibitiy of 4000 Kms (2000 Km's ceiling limit + 2000 Km's execess run) along with deploment of addtional 3 [2 (Monthly) + 1 (Man Days)] drivers, for the period of 1 year, for providing pick and drop facility (Gharghoda to GP-III Mines and vice versa) to the CSPGCL staff working in shifts at GP-III coal mines weighbridge for transportation of coal from GP-III Coal Mine to ABVTPS Marwa. | 1314810/- | 13150/- | 26/09/2024 04:00PM | 26/09/2024 04:15PM | 25043 |
| 04:15PM | 04:00PM |
| |
29
| SE (Civil) CMDC | S.E.(C)/CMDC/GP-III/T/24-25/T-09 | Hiring of 1 No. jeep for the period of 1 year for E.E.(Civil)-II CMDC, CSPGCL, Gharghoda. | 704138/- | 7050/- | 26/09/2024 04:00PM | 26/09/2024 04:15PM | 25036 |
| 04:15PM | 04:00PM |
| |
30
| SE (Civil) CMDC | S.E.(C)/CMDC/GP-III/T/24-25/T-08 | Hiring of one no. jeep with additional 2 no. driver for the period of 1 years for inside mine area at Gare Pelma Sector-III Coal Block. | 1061726/- | 10650/- | 26/09/2024 04:00PM | 26/09/2024 04:15PM | 25034 |
| 04:15PM | 04:00PM |
| |
31
| SE (Civil) CMDC | S.E.(C)/CMDC/GP-III/T/24-25/T-07 | Hiring of one no. jeep for the period of 1 year for vigilance team of coal transportation and for general shift for collier Engineer and Mining staff under civil circle CMDC, CSPGCL, Gharghoda Distt.-raigarh (C.G.) | 700056/- | 7050/- | 26/09/2024 04:00PM | 26/09/2024 04:15PM | 25031 |
| 04:15PM | 04:00PM |
| |
32
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/P/T/10/4786 dt:09.09.2024 | Procurement of Hylomer universal blue jointing compound for AOH of TG Unit-2 of 2x500MW, ABVTPS, CSPGCL, Marwa | 0.86L | 0 | 08/10/2024 03:00PM | 08/10/2024 03:30PM | 25184 |
| 03:30PM | 03:00PM |
| |
33
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-218/24/2632 | Supply of various types of pin bush coupling for CHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 599912/- | 6000/- | 04/10/2024 03:30PM | 04/10/2024 04:00PM | 25183 |
| 04:00PM | 03:30PM |
| 8100039144 |
34
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-I/P/T-219/24/2632 | Supply of distribution pipes & Fittings for Natural draught cooling tower of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1436507/- | 14370/- | 04/10/2024 03:30PM | 04/10/2024 04:00PM | 25173 |
| 04:00PM | 03:30PM |
| 8100039094 |
35
| S.E.(Civil) Circle-II | No. 257 date 10.09.2024: T/s No. SEC-II/ABVTPS/2024/T-27 | Fabrication and installation of height gauge barrier at junction of canal road to service road of Auraikala ash dyke at 2x500MW ABVTPS, CSPGCL, Marwa-Tendubhatha | 71300.00 | 800.00 | 30/09/2024 04:00PM | 30/09/2024 04:15PM | 25169 |
| 04:15PM | 04:00PM |
| |
36
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-I/P/T-215/24/2612 | Supply of Tools Holders, Drill Chucks, Inserts & Miscellaneous items for machines installed at Workshop, 2x500 MW, ABVTPS, CSPGCL, Marwa, Janjgir-Champa. | 458868/- | 4600/- | 03/10/2024 03:30PM | 03/10/2024 04:00PM | 25167 |
| 04:00PM | 03:30PM |
| 8100039091 |
37
| S.E.(CHP-Maint.) | 15-16/CHP:Maint./P/T-Ele-14/24-25/1620 | Procurement of different types of switches installed at various location at CHP, 2X500MW, ABVTPS, Marwa | | 0 | 04/10/2024 03:30PM | 04/10/2024 04:00PM | 25165 |
| 04:00PM | 03:30PM |
| |
38
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-217/24/2608 | Work contract for deployment of 04 nos Computer Data Entry Operators for offices under administrative control of Addl. C.E.(T&SS) 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 980580/- | 9810/- | 08/10/2024 03:30PM | 08/10/2024 04:00PM | 25149 |
| 04:00PM | 03:30PM |
| 8100039115 |
39
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-214/24 | Contract for supply of Cable, HDPE pipe for erection work for Highmast near ash dyke of AHP,2x500 MW, ABVTPS, CSPGCL, Marwa, Janjgir-Champa. | 1127637.50 | 11300/- | 09/10/2024 03:30PM | 09/10/2024 04:00PM | 25144 |
| 04:00PM | 03:30PM |
| 8100039118 |
40
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-213/24 | Work contract for day to day lighting maintenance work under ESP area at 2x500 MW, ABVTPS, CSPGCL, Marwa, Janjgir-Champa. | 966491/- | 9700/- | 08/10/2024 03:30PM | 08/10/2024 04:00PM | 25143 |
| 04:00PM | 03:30PM |
| 8100039117 |
41
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-212/24 | Work contract for replacement/erection and commissioning of damaged/new hopper heaters at ESP of Unit#2 during COH of Unit#2 of 2x500 MW, ABVTPS, CSPGCL, Marwa, Janjgir-Champa. | 1495107.20 | 14960/- | 07/10/2024 03:30PM | 07/10/2024 04:00PM | 25142 |
| 04:00PM | 03:30PM |
| 8100039116 |
42
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/P/T-206/24/2558 | Supply of MS Chequered plate for strengthens of duct at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1447790/- | 14500/- | 01/10/2024 03:30PM | 01/10/2024 04:00PM | 25137 |
| 04:00PM | 03:30PM |
| 8100039044 |
43
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-205/24/2558 | Supply of Transportation/Shifting of Scrap (Worn out Heating Element, Grating etc.) of APH during COH of U#2, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 897000/- | 9000/- | 30/09/2024 03:30PM | 30/09/2024 04:00PM | 25136 |
| 04:00PM | 03:30PM |
| 8100038996 |
44
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-204/24/2558 | Supply of Material & Erection of Canopy & Bird Catcher along with removal of damaged canopy for PA Fan 1A, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1487000/- | 14900/- | 30/09/2024 03:30PM | 30/09/2024 04:30PM | 25134 |
| 04:30PM | 03:30PM |
| 8100038995 |
45
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/P/T-203/24/2558 | Supply of Inorganic Anti Rust Compound for Structure, Piping & Auxiliaries of Boiler of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1328000/- | 13300/- | 30/09/2024 03:30PM | 30/09/2024 04:00PM | 25133 |
| 04:00PM | 03:30PM |
| 8100038993 |
46
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/P/T-197/24/2558 | Supply of Hydraulic Jack Capacity 50Tons & 100 Tons for Milling System at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 856476/- | 8600/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25132 |
| 04:00PM | 03:30PM |
| 8100038867 |
47
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/P/T-196/24/2558 | Supply of Journal Head Liner Assembly of Coal Mill XRP 1003 at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1427112.41 | 14300/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25131 |
| 04:00PM | 03:30PM |
| 8100038866 |
48
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/P/T-195/24/2558 | Supply of Sailma Steel Plate for strengthens of duct at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1437665/- | 14400/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25130 |
| 04:00PM | 03:30PM |
| 8100038865 |
49
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/T-176/24/2211 dtd. 31.07.2024 | Work contract for Repair, Painting, Naming & Numbering on Panels and Kiosk of 220/400 KV switchyard for 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 285786 | 2860 | 13/09/2024 03:30PM | 13/09/2024 04:00PM | 24897 |
| 04:00PM | 03:30PM |
| 8100038470 |
50
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-113/24/1513 | Work contract for replacement/ erection of damaged refractory cooling segment inside BAH of unit #1 &2 during AOH/COH at AHP of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1132800/- | 11350/- | 20/09/2024 03:30PM | 20/09/2024 04:00PM | 4362 |
| 04:00PM | 03:30PM |
| 8100037229 |
51
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/AHP/W/T-209/24 | Work contract for supply and laying of 25NB MS pipeline along with all the consumables for service airline tapping from 3.5M elevation at ESP Hopper to various parts of ESP hopper and ESP Switchgear room at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 495128/- | 4960/- | 26/09/2024 03:30PM | 26/09/2024 04:00PM | 25126 |
| 04:00PM | 03:30PM |
| 8100039086 |
52
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-207/24/2534 | Supply of Deflector rollers DR-2 for 2000mm wide conveyor belt of belt feeders for CHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 973905.92 | 9750/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25120 |
| 04:00PM | 03:30PM |
| 8100038927 |
53
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-208/24/2534 | Work contract for supply & erection of toe guard in CHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1475566.40 | 14760/- | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25119 |
| 04:00PM | 03:30PM |
| 8100038928 |
54
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-I/W/T-122/24/1536 | Work contract for Supply and application of Rock Wool Insulation with Sheet for Turbine & Boiler area of both units of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1486404.70 | 14865/- | 20/09/2024 03:30PM | 20/09/2024 04:00PM | 24442 |
| 04:00PM | 03:30PM |
| 8100037223 |
55
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/P/T/08/4561 dt:02.09.2024 | Procurement of Ball Valve for turbine maintenance division of 2x500MW, ABVTPS, CSPGCL, Marwa | 1.82L | 0 | 27/09/2024 03:30PM | 27/09/2024 03:30PM | 25117 |
| 03:30PM | 03:30PM |
| |
56
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/P/T/09/4553 dt:02.09.2024 | Procurement of special purpose welding electrode for TMD of 2x500MW, ABVTPS, CSPGCL, Marwa | 1.9L | 0 | 27/09/2024 03:30PM | 27/09/2024 03:30PM | 25116 |
| 03:30PM | 03:30PM |
| |
57
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-I/P/T-188/24/2549 | Supply of booster pump / inline pump with motor to provide desired pressure and flow for precision unit, ESP Unit # 2, 2x500 MW, ABVTPS, CSPGCL, Marwa, Janjgir-Champa. | 477249/- | 4780/- | 30/09/2024 03:30PM | 30/09/2024 04:00PM | 25115 |
| 04:00PM | 03:30PM |
| 8100038758 |
58
| S.E.(Boiler) | 15-17/ABVTPS/Boiler/P/T-15/4464 | Supply and Fixing of Vertical Blinds at the O/o SE (Boiler), 2X500 MW, ABVTPS, CSPGCL, Marwa | | | 25/09/2024 03:30PM | 25/09/2024 03:30PM | 25114 |
| 03:30PM | 03:30PM |
| |
59
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/TN-128/24/T-202/24/2511 dtd. 30.08.2024 | Work contract for maintenance of computers & its peripherals installed at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 833888.30 | 8400 | 27/09/2024 03:30PM | 27/09/2024 04:00PM | 25112 |
| 04:00PM | 03:30PM |
| 8100038909 |
60
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/TN-128/24/T-201/24/2511 dtd. 30.08.2024 | Work along with supply for modification of impulse line of Mill DP and seal air to bowl DP transmitter in mill system at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 705866.56 | 7100 | 26/09/2024 03:30PM | 26/09/2024 04:00PM | 25111 |
| 04:00PM | 03:30PM |
| 8100038908 |
61
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-I/P/T-160/24/1719 | Supply of Various Tools, Consumables & Miscellaneous items for machines installed at Workshop, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 480202/- | 4810/- | 12/09/2024 03:30PM | 12/09/2024 04:00PM | 24710 |
| 04:00PM | 03:30PM |
| 8100037761 |
62
| S.E.(AHP) | 15-22/ABVTPS/AHP/W/T-15/4446, Marwa date- 28.08.2024 | Work contract for Servicing/Overhauling & Replacement of damaged spares of 03 Ton capacity Electrical Hoist installed at silo top- 1 of Ash Handling, ABVTPS, Marwa. | 249570 | 2500 | 25/09/2024 01:30PM | 25/09/2024 03:30PM | 25087 |
| 03:30PM | 01:30PM |
| |
63
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/W/T-04/3636, Marwa, Dtd.- 01.08.2024 | Invitation of Tender with Pre Qualifying Requirements (Eligibility Criteria Conditions for opening of price Bids) to award Work Contract for Complete Overhauling of Shaper Machine (Model-ABL 630, Machine No.-411) with supply of Consumables & Spares, installed at Workshop, 2X500MW, ABVTPS, Marwa, CSPGCL, Janjgir-Champa. | 199243.00 | 1995.00 | 13/09/2024 03:00PM | 13/09/2024 03:30PM | 24904 |
| 03:30PM | 03:00PM |
| |
64
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/P/T-07/4409 Marwa dt. 28.08.2024 | Procurement of primer, thinner and synthetic enamel paint for painting of tanks and pipelines installed in Turbine area of 2X500 MW,ABVTPS, Marwa. | | 0 | 24/09/2024 03:30PM | 24/09/2024 04:00PM | 25078 |
| 04:00PM | 03:30PM |
| |
65
| S.E.(Turbine) | 15-18/ABVTPS/Turbine/W/T-07/4407 Marwa dt. 28.08.2024 | Work contract for complete maintenance of stop log gate along with supply for NDCT basin at 2X500 MW, ABVTPS, Marwa. | 215846 | 2160 | 24/09/2024 03:30PM | 24/09/2024 04:00PM | 25077 |
| 04:00PM | 03:30PM |
| |
66
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-IV/W/T-198/24/2471 | Work contract for Fabrication, fixing and installation of barricading around Mill bay of Unit#1 at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 499671/- | 5000/- | 23/09/2024 03:30PM | 23/09/2024 04:00PM | 25075 |
| 04:00PM | 03:30PM |
| 8100038864 |
67
| Addl. Chief Engineer (S&P) | No.15-06/S&P/EE-II/W/T-178/24/2233 | Work contract for reconditioning of drive & driven rollers of 75 TPH Clinker Grinder (Make: Macawber Beekay) installed at AHP of 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 494187.54 | 4950/- | 13/09/2024 03:30PM | 13/09/2024 04:00PM | 24909 |
| 04:00PM | 03:30PM |
| 8100038498 |
68
| S.E.(Civil) Circle-I | 005-7800/Tend./ABVTPS/450 Marwa Dtd. 27.08.2024 | Levelling and rolling of playground for colony premises at2x500MW, ABVTPS CSPGCL Marwa. | 196301.00 | 2000.00 | 19/09/2024 04:00PM | 19/09/2024 04:15PM | 25072 |
| 04:15PM | 04:00PM |
| Tender Specification No.- SEC-I/ABVTPS/2024/T-24 |
69
| S.E.(Civil) Circle-I | 005-7800/Tend./ABVTPS/450 Marwa Dtd. 27.08.2024 | Providing emergency approach road from SNT Building towards CHP area of 2x500MW, ABVTPS CSPGCL Marwa. | 273400.00 | 2800.00 | 19/09/2024 04:00PM | 19/09/2024 04:15PM | 25071 |
| 04:15PM | 04:00PM |
| Tender Specification No. SEC-I/ABVTPS/2024/T-23 |
70
| S.E.(Boiler) | 15-17/ABVTPS/Boiler/P/T-14/4056 | Procurement of duplon wire braided pvc hose pipe for ESP of 2X500MW, ABVTPS, CSPGCL, Marwa. | 138650.00 | | 18/09/2024 01:30PM | 19/09/2024 03:30PM | 25059 |
| 03:30PM | 01:30PM |
| |
71
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/TN-123/24/T-194/24//2459 dtd. 27.08.2024 | Work contract for Assistance to maintenance of Electrical Actuators, Pneumatic Actuators, Maintenance of Shoot blowers and providing assistance to various Expert Service Engineers (Hp By pass Valve etc) During Overhaul of Unit#2, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 974302 | 9750 | 24/09/2024 03:30PM | 24/09/2024 04:00PM | 25068 |
| 04:00PM | 03:30PM |
| 8100038834 |
72
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-III/W/TN-123/24/T-193/24/2459 dtd. 27.08.2024 | Work contract for Supply and installation of 40W well glass LED light fitting including Laying, Glanding and Termination of 3CX2.5sq mm Cu armoured cable to restore lighting circuit at various floor of boiler unit-2, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1485620 | 14860 | 23/09/2024 03:30PM | 23/09/2024 04:00PM | 25067 |
| 04:00PM | 03:30PM |
| 8100038833 |
73
| S.E.(CHP-Maint.) | NIT No. 15-16/CHP-Maint/P-T-11/24-25 | Proucrement of various types of grease Nipples for plummer blocks, Carbon Steel Elbow, Carbon Steel connector for straight, Carbon steek seamless tube & Carbon steel straight Coupling for S/R -1 &2 of CHP, ABVTPS, CSPGCL, Marwa | | | 24/09/2024 03:00PM | 24/09/2024 03:30PM | 25066 |
| 03:30PM | 03:00PM |
| |
74
| S.E.(CHP-Maint.) | No. 15-16/CHP:Maint./PT-Ele.- 13/2024 – 25/1422 | Procurement of Pull Cord Switch Type: ROE/JB/FP/II installed at various location of CHP, 2x500MW, ABVTPS, Marwa | | | 12/09/2024 03:00PM | 13/09/2024 03:30PM | 25064 |
| 03:30PM | 03:00PM |
| |
75
| S.E.(CHP-Maint.) | No. 15-16/CHP:Maint./PT-Ele.- 12/2024 – 25/1421 | Procurement of Level Cum Temperature Transmitter, Master Converter & its Connector for Conveyors Hydraulic System of CHP, 2x500MW, ABVTPS, Marwa | 190676.20 | 0.00 | 12/09/2024 03:00PM | 13/09/2024 03:30PM | 25063 |
| 03:30PM | 03:00PM |
| |
76
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-192/24/2423 | Supply of Impact Roller for 1400mm wide conveyor Belt for Coal Handling Plant in, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1361155.63 | 13620/- | 18/09/2024 03:30PM | 18/09/2024 04:00PM | 25055 |
| 04:00PM | 03:30PM |
| 8100038784 |
77
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-191/24/2423 | Supply of electro-hydraulic thruster rail clamp installed at CHP, 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 790600/- | 7910/- | 18/09/2024 03:30PM | 18/09/2024 04:00PM | 25054 |
| 04:00PM | 03:30PM |
| 8100038783 |
78
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/P/T-189/24/2423 | Supply of Carrying Roller for 1400mm wide conveyor Belt for CHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1417869.12 | 14180/- | 18/09/2024 03:30PM | 18/09/2024 04:00PM | 25052 |
| 04:00PM | 03:30PM |
| 8100038781 |
79
| Addl. Chief Engineer (S&P) | 15-06/S&P/EE-II/W/T-184/24 | Work contract for supply, fabrication and erection of maintenance shed for silo area of AHP at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 956390/- | 9600/- | 19/09/2024 03:30PM | 19/09/2024 04:00PM | 25050 |
| 04:00PM | 03:30PM |
| 8100038776 |
80
| Addl. Chief Engineer (S&P) | 15-06/S&P/P/W/TN-120/24/T-187/24/2395 Marwa, dtd. 20.08.2024 | Supply of complete Submersible Pump and Booster Pump with Motor & control panel for feeding water to RCC overhead tank from surface sump at colony premises at 2x500 MW, ABVTPS, CSPGCL, Janjgir-Champa. | 1458480 | 14590 | 13/09/2024 03:30PM | 13/09/2024 04:00PM | 25035 |
| 04:00PM | 03:30PM |
| 8100038759 |
81
| S.E.(Boiler) | 15-17/ABVTPS/Boiler/P/T-13/4060 dated 14/08/2024 | Procurement of lube oil filter(model-MFI4262) for mill xrp-1003 | 1.99 lac | 0 | 12/09/2024 03:00PM | 12/09/2024 03:30PM | 25016 |
| 03:30PM | 03:00PM |
| |
82
| S.E.(C&I) | 15-38/ABVTPS/C&I/P/T-04/4055, Marwa date- 14/08/2024 | Supply of CAT6 UTP network cable, connectors and other networking accessories for DCS system installed at 2x500MW, ABVTPS, Marwa. | | 0 | 12/09/2024 03:30PM | 12/09/2024 04:00PM | 25014 |
| 04:00PM | 03:30PM |
| |
83
| S.E.(OPRN) | 15-20/ABVTPS/oprn./W-T-03/4052 Marwa dtd.14/08/2024 | Hydraulic Stretch Test, valve repairing/replacement, painting, refilling oxygen gas in cylinder and transportation for coal sampling lab and Hospital 2X500 MW, ABVTPS, CSPGCL, MARWA | | 2090 | 12/09/2024 03:00PM | 12/09/2024 03:30PM | 25009 |
| 03:30PM | 03:00PM |
| |